Features

Every capability, with an honest readiness label

A detailed look at each management surface — what it does and how ready it is. For the big-picture overview of the unified workspace, see Platform.

Capabilities

Core capabilities

Status reflects current readiness: Available, Pilot, Beta, In Development, or Planned.

Pilot

Source Assessment

Inventory source mailboxes and folders so a project is scoped on facts, not guesses.

  • Mailbox & folder discovery
  • Size and item estimates
  • Scope into batches
Available

User & Batch Mapping

Map source identities to targets and group them into manageable migration batches.

  • Source → target user mapping
  • Batch grouping & windows
  • Per-batch run controls
Available

Endpoints & Credentials

Register source and destination endpoints and store the secrets they need to connect.

  • IMAP / Microsoft 365 endpoints
  • Connectivity dry-runs
  • Secret storage
Pilot

Job Orchestration

Queue, run, pause, and retry migration jobs with live status — full and delta passes.

  • Full / delta / validation runs
  • Pause & resume
  • Automatic retry of failed items
Beta

Validation & Reconciliation

Compare source and target item counts and surface exactly what did not arrive.

  • Item-count reconciliation
  • Failure & warning surfacing
  • Targeted retries
Available

License Management

Reserve, assign, and track the licenses a migration project consumes.

  • Inventory & assignments
  • Required vs assigned
  • Threshold alerts
Pilot

Reporting & Visibility

Per-project dashboards summarising progress, warnings, and completion.

  • Project & job dashboards
  • Warning / failure rollups
  • Exportable summaries
Available

Roles & Access

A role and permission model that scopes who can view, run, and approve work.

  • 9 platform roles
  • Resource-level permissions
  • Auditor & read-only access
Lifecycle Mapping

How capabilities map to the lifecycle

Each capability supports one or more stages of the Assess → Report lifecycle.

1
Assess
Discover source mailboxes, sizes, and structure before any data moves.
2
Plan
Map users, scope batches, and reserve the licenses a project needs.
3
Stage
Prepare endpoints and credentials; dry-run connectivity to source and target.
4
Migrate
Run full and delta passes in controlled batches with live job status.
5
Validate
Reconcile item counts, surface failures, and retry the items that need it.
6
Cutover
Schedule the switch, finalise delta sync, and complete the move.
7
Report
Produce per-project summaries of what migrated, what warned, and what failed.